FPS always starts the project definition from on-site supervision to check the installation area and discuss with the end-user his specific needs. First of all, a preliminary design is realized and when the real project starts an ergonomic study on a 1:1 scale mock-up is performed to check real activities to be performed. When this important step is completed the final manufacturing of the system is started.
FPS propose different configurations:
• Simple single chamber mobile reactor loading system for small quantity charging operation
• Single chamber reactor loading system, with integrated multi drum lifting device and Vacuum Transport system
• Double chamber reactor loading system with integrated external multi drum lifting device
• Double chamber dryer loading system with integrated internal multi drum lifting device
Don't hesitate to contact us for more information on loading systems configurations.